Jump to content
Sturgeon's House

Search the Community

Showing results for tags 'ifv'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • The Outer Rim
    • Open Discussion
    • Aviation
    • Elon Musk: Making Space Great Again
    • Naval Discussion
    • Mechanized Warfare
    • Ballistics Science Discussion
    • Infantry Tools & Tactics
    • Dr. Strangelove's Nuclear Palace
    • Biosciences
    • History, Culture, and Archaeology
    • Fiction & Entertainment
    • Computers, Software, and Tech Support
    • Historical Warfare
    • Sturgeon's Contests

Blogs

  • Of IS-7s and Other Things
  • Archive Awareness
  • Unstart's Blog
  • The Sherman Blog
  • U-47

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests

Found 4 results

  1. Welcome to Mighty Zuk's place of mental rest and peace of mind. This is my realm. I've decided it would be best to ditch the old Merkava thread for 2 reasons: 1)It does not feature any bunched up information in its main post, and valuable information is scattered across different posts on different pages. 2)Many AFVs that are not related to the Merkava, or related but are not it, appear in that thread with improper representation. There are other AFVs than the Merkava, and it would be better to refer to them in a general way. As time will go by, I will arrange this
  2. The following is derived from various wanderings, discussions, & tyre kicking, and covers an opinion on the forthcoming Land 400 Phase 3 Request for Tender, and is as per June 2018. General: Phase 2 will significantly shape participation in Phase 3. Costs for the two bidders that weren’t short listed for the Risk Mitigation Activity (GDLS & Elbit Systems) ran into the tens of millions of dollars. Costs for the losing BAE bid could rightly be assessed as double that. Combined with Rheinmetall’s Phase 2-driven “perceived incumbency”, nobody wants to waste money to be a stalki
  3. Lets start a thread about the CV-90. Past, present, futur. Link to the Linström's page about the initial Stridsfordon-90 project : http://www.ointres.se/projekt_strf90.htm An interesting SH-MM post about evolution of CV-90 : And a summary about contenders for the forseen Czech IFV programme : http://below-the-turret-ring.blogspot.pt/2017/08/which-new-ifv-for-czech-army.html?m=1 From a well known blog.
×
×
  • Create New...