11 hours ago, Sturgeon said:

Israeli "Carmel" tank promises to funnel gullible investors' money into company pockets, never move beyond mockup stage.

 

How did you come up to that conclusion from merely that one article? Which I must say, is misleading as it's basing itself on false information. The Carmel was never intended to replace the Merkava, and Jpost, who first reported this, mistaken it for such an attempt. 

Share this post


Link to post
Share on other sites
4 hours ago, Mighty_Zuk said:

How did you come up to that conclusion from merely that one article? Which I must say, is misleading as it's basing itself on false information. The Carmel was never intended to replace the Merkava, and Jpost, who first reported this, mistaken it for such an attempt. 

 

I'm psychic.

Share this post


Link to post
Share on other sites

A new article from "Ynet News" adds new info on the Barak and other programs.

Just a reminder, Barak is an upgraded Merkava 4M. 

 

https://www.yediot.co.il/articles/0,7340,L-5043863,00.html

 

It's in Hebrew, but I have taken upon myself to translate the important bits here (some new, some old, I will mark it):

 

1)The Barak weighs 70 tons. (new)

 

Ex: In Israel, exact figures are almost never given. It's not because it's OPSEC, but because that's the sort of mentality here. Only the engineers will handle that, and the plebs get rounded numbers. So it could mean about 69, or it could be 73. 

However up until now it's always been 60-65 tons, so we could see some solid amount of equipment added to the tank, which will be interesting. On the downside, it means weight reduction measures probably weren't taken and I shouldn't explain why excessive weight is bad.

 

2)Utilizes an AI-managed "mission computer". (new/old)

 

Ex: Okay so we've heard plenty of times that many actions will be automated, and that means AI. It was said however mostly in the context of the firing loop. Now they say the mission computer, otherwise known as BMS, will automatically manage certain comms with other assets that will also include the Namers and Eitans among others. Info that was previously manually input by the TC (commander). 

The AI will be able to make various decisions based on the targets it identifies, whether based on the optics or the APS, and advise the crew on certain actions, and make terrain-mapping related decisions such as pointing optimal firing positions or dangerous areas.

 

3)Female voice selected to alert crews via BMS. (new)

 

Ex: Easy to distinguish from a male voice, so it won't blend in with the crew's voices, and the crew will not ignore it (they tend to ignore messages from crewmen). Among the alerts it will give are "Missiles", "Short range ATGM", and "Turning over" which means it will not only alert the crew of the type of threat and thus approximate time to impact, but also of terrain related issues to minimize accidents.

 

4)It was tested as a fully autonomous vehicle. (new)

 

Ex: But there is no operational requirement, for obvious reasons, so it's merely a test. 

 

5)Hybrid powerplant. (new)

 

Ex: To cope with the higher weight and to save on fuel, hybrid is the way to go. This could also give it an amazing torque and make it a "little" speed demon. And as an environmentalist it really gives me some relief.

 

6)IronVision helmet system tested last month (October). (old)

 

Ex: I thought it was scheduled to be tested in April, but nonetheless it's good news it happened. The date for operational fielding has remained unchanged, and even rounded down to 2020, so there's no delay but a re-scheduling. 

 

7)IronVision to be tested soon on Company-sized force. (new)

 

Ex: Means less time required for full operational testing, if they segment the operational testing phases to do in parallel with the program.

 

8)Starting next year, 3 times as many Trophy-equipped vehicles will be manufactured as this year. (new)

 

Ex: While the production rate is still minimal, to keep the work stable and allow to double the output when needed urgently, the front-line units will benefit greatly and at a quick rate from this decision. It also comes in light of the recent contract for 1,000 Trophy systems, and the decision to not only equip the Namers and Eitans with it, but also the Merkava 3.

 

9)USA is purchasing 100 Trophy systems (brigade-sized). (new/old)

 

Ex: Some speculated on either possibility. Either the contract was merely for the support of the installation of systems, or for the purchase of a brigade-worth of systems. Now it's confirmed that they are indeed equipping an entire brigade.

 

 

 

Big wall of text, I know, so I give you here Brig. Gen. Baruch Matzliach holding Israel's big stick's big stick:

 

9621729_9616709_rumble.jpg

Share this post


Link to post
Share on other sites

Someone claims to be personally familiar with the incident - says it occurred in 2006 after an ATGM hit the powerpack section. Fire was put out quickly enough, engine replaced and it returned to service very shortly after.

 

I don't know what kind of data and statistics MANTAK have, and I know they make overall very practical decisions, but I think it's about time the LFP gets some armor. The hull is too tall to neglect that area and focus all the frontal armor on the UFP.

5pCs8Wz9sRQ.jpg

 

 

Share this post


Link to post
Share on other sites
26 minutes ago, SH_MM said:

That's quite a large hole in the upper front plate. Must have been a large calibre ATGM.

That's probably not a hole. When the transmission hatch is open, there is a small gap in front of it, between it and the UFP. The fire comes out from that gap, and it's been estimated to be a fuel fire.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Similar Content

    • By 2805662
      The following is derived from various wanderings, discussions, & tyre kicking, and covers an opinion on the forthcoming Land 400 Phase 3 Request for Tender, and is as per June 2018.
       
      General: Phase 2 will significantly shape participation in Phase 3. Costs for the two bidders that weren’t short listed for the Risk Mitigation Activity (GDLS & Elbit Systems) ran into the tens of millions of dollars. Costs for the losing BAE bid could rightly be assessed as double that. Combined with Rheinmetall’s Phase 2-driven “perceived incumbency”, nobody wants to waste money to be a stalking horse on the Commonwealth’s behalf. There is a plausible risk that only Rheinmetall will bid. 
       
      Reorganisation of infantry sections: When Land 400 was conceived, Australian infantry sections consisted of two fire teams of four. This drove the initial “eight dismounts” requirement that has subsequently been relaxed. Now comprising three fire teams of three, one of those teams will be the vehicle crew, the other two will dismount, for a total of six dismounts. Recent operational experience has highlighted the need for temporary attachment of specialist personnel, so a platform that has some spare seating could still count for it. 
       
      GFE Turrets: One possible tactic that the Commonwealth may seek to use is that of mandating that the Lance Turret, as used on the Phase 2 Boxer CRV, be used as Government Furnished Equipment (that is, purchased from Rheinmetall and provided to suitably configured hulls by competitors). This would simplify the turret training and offer spares commonality across both phases. Perceived savings for “buying in bulk” were (apparently) unable to be realised as Rheinmetall was reluctant to discount its turret. 
      Costs aside, if an offerer has a GFE turret, who owns the systems integration risk? Who does the customer turn to solve potential issues between the turret and hull when they, the customer, has mandated that particular turret? Commercially, this is a high risk proposition. 
       
      Unmanned turrets: Only GDLS offered an unmanned/remote turret for Phase 2, the Kongsberg MCT-30, as has been adopted in small numbers (81) by the US Army to meet an immediate operational need. A bias against unmanned turrets is unlikely to manifest itself in Phase 3 due to the likely presence of the PSM Puma IFV. Of course, that’ll likely to open the door to GDLS bidding the ASCOD fitted with Elbit’s optionally manned/unmanned MT-30 turret....should they decide to bid at all. 
       
      Likely bidders: This brings us to the inevitable list of potential bidders and their platforms. 
       
      BAE: Unlikely to bid. If they win SEA 5000, that may get them off the bench, as would a requirements set that looks a lot like CV90. In the event that they do bid, the CV90 Mk4 is the most likely platform. 
       
      GDLS: More likely to bid than BAE, but still waiting to see what the RFT looks like. (Tellingly?) Their ASCODs at Eurosatory were painted for upcoming European opportunities, not in the distinctive Australia disruptive pattern. 
       
      Rheinmetall: likely to offer the Lynx and maybe also the Puma. With the reorganisation of Australian infantry sections (see above) the eight dismounts of the KF41 version of the Lynx are less relevant. Still, the modularity of the KF41 demonstrated at Eurosatory 18 definitely left an impression. 
       
      PSM: As a JV between KMW & Rheinmetall, Puma may be offered separately (unlikely if the Boxer =\= ARTEC in Australia model is followed). In the event that is is offered separately, it’s high unit cost, without the associated modularity of Boxer, may be a disadvantage. Also, PSM has no experience with industrial partnerships in Australia: a significant disadvantage. 
       
      Hanwha Defense Systems: Korea has been a bit “off” Australian defence opportunities, largely due to the cack-handed way in which the cancellation of the K-9/AS-9 was handled in 2012. The AS-9 was viewed as a loss leader, primarily as Australia has a reputation of being a discerning (aka difficult) customer. If Hanwha bids their K21, it’ll be interesting to watch. 
       
      Whilst by no means exhaustive, the above outlines some less-obvious factors currently at play for the 450-vehicle opportunity that is Land 400 Phase 3.  
       
    • By Sovngard
      Meanwhile at Eurosatory 2018 :
       
      The Euro Main Battle Tank (EMBT), a private venture project intended for the export market.
       


    • By Alzoc
      Topic to post photo and video of various AFV seen through a thermal camera.
      I know that we won't be able to make any comparisons on the thermal signature of various tank without knowing which camera took the image and that the same areas (tracks, engine, sometimes exhaust) will always be the ones to show up but anyway:
       
      Just to see them under a different light than usual (pardon the terrible pun^^)
       
      Leclerc during a deployment test of the GALIX smoke dispenser:
       
      The picture on the bottom right was made using the castor sight (AMX 10 RC, AMX 30 B2)
       
      Akatsiya :
       

       
      T-72:
       


       
      A T-62 I think between 2 APC:
       

       
      Stryker:
       

       
      Jackal:
       

       
      HMMWV:
       

       
      Cougar 4x4:
       

       
      LAV:
       

    • By Walter_Sobchak
      I realized that we don't actually have a thread about the British Chieftain tank.  
       
      I posted a bunch of Chieftain related stuff on my site today for anyone who is interested.  The items include:
       
      Magazine Articles
       
      1970 article from ARMOR
      1970 article from IDR  - Chieftain-Main Battle tank for the 1970s
      1976 article from IDR - The Combat-Improved Chieftain – First Impressions
      1976 article from IDR - Improved Chieftain for Iran
       
      Government reports
       
      WO 194-495 Assessment of Weapon System in Chieftain
      WO 341-108 Automotive Branch Report on Chieftain Modifications
      DEFE 15-1183 – L11 Brochure 
      WO 194-463 – Demonstration of Chieftain Gun 
       
      WO 194-1323 – Feasibility study on Burlington Chieftain
×